Project Description
DESCRIPTION
Temporary shoring for a new City air treatment facility required an open excavation up to 35ft deep excavated on top of and with connection to and existing underground tunnel structures. A combination of temporary sloping and cantilever shoring pile provided an open workspace for the construction of the facility without the need for wall penetrations.
LOCATION
Los Angeles, CA
CLIENT
Metro Builders and Engineers